Skip to content
PN40IP65Self-Monitoring

Spirax Sarco LP30 Conductivity Probe for Level Control

The Spirax Sarco LP30 conductivity probe provides highly accurate, self-monitoring low level alarms for steam boilers up to 32 bar g and 239°C.

Spirax Sarco LP30 Conductivity Probe for Level Control

The Spirax Sarco LP30 conductivity probe, when used in conjunction with the LC3000 or LC3050 level controller, provides highly accurate, self-monitoring low level alarms for steam boilers. It consists of a sensor body (with a removable cable plug) and a separate sensor probe. Under normal operating conditions, the sensor probe is partially immersed, and the resistance to earth is low. When the water level drops below the sensor probe, the resistance to earth becomes high, causing the controller to issue a low-level alarm signal. The comparator probe compensates for any earth resistance leakage caused by scale, dirt, or internal moisture, ensuring a correct low-level alarm is detected even under harsh conditions.

Features

  • High-accuracy, self-monitoring low level alarm sensor.
  • Suitable for pressures up to 32 bar g (239°C).
  • Maintenance-free operation.
  • Securely fixed sensor probe.
  • Available probe lengths: 500 mm (19.7"), 1000 mm (39.4"), and 1500 mm (59").

Limiting Conditions

ParameterValue
Design pressure conditionsPN40
Maximum boiler pressure32 bar g (464 psi g)
Maximum temperature239°C (462°F)
Cold hydraulic test pressure60 bar g (870 psi g)
Maximum ambient temperature70°C (158°F)
Maximum sensor cable length50 metres (164 ft)
Cable plug sealing ratingIP65

Materials

No.PartMaterialStandard
1Sensor bodyAustenitic stainless steelBS EN 10088-3 (1.4306)
2CoverAustenitic stainless steelType 316L
3Name-platePolycarbonate
4Plug and socketPolyamide
5GasketSilicone rubber
6Comparator probeAustenitic stainless steelType 316L
7Primary & secondary insulatorsPTFEBS 6564 Grade UA Type 1
8Dowel pinAustenitic stainless steelType 302/304
9Probe tipAustenitic stainless steelType 316L
10Lock-nutAustenitic stainless steelBS 6105 A4 80

Spirax Sarco LP30 dimensions and materials diagramSpirax Sarco LP30 dimension details

Weights (approximate, including packaging)

Probe Length500 mm (19.7")1000 mm (39.4")1500 mm (59")
Sensor Weight0.51 kg (1.1 lb)0.63 kg (1.4 lb)0.92 kg (2.0 lb)

Note: Sensor weight alone is 0.32 kg (0.7 lb).

Spirax Sarco LP30 weight table diagram

Wiring Diagram

Spirax Sarco LP30 low level alarm wiring diagram

Installation

The sensor features a ½" BSP female threaded connection. A protection tube is required when installed in a boiler or a highly turbulent tank. The products have been specifically designed for use on steam or condensate which are in Group 2 of the Pressure Equipment Directive 2014/68/EU (Category 4 Safety Accessories).

WARNING

It is essential that the probe tip of the LP30 does not touch any part of the boiler. Standards require that the tip is at least 14 mm from the protection tube, and this must be checked when the probe is installed.

Probe Clearance Test

This test ensures the satisfactory installation of new systems and may also be used for fault finding on existing systems. A pair of 'checking wires' are used in conjunction with an Insulation Resistance Tester to test if there is less than 14 mm radial clearance from the tip end. This test is particularly useful for probe lengths over 800 mm. Shorter probes may be checked for alignment by visual means alone.

Test Method:

  1. Drain water level to at least 50 mm below alarm level and vent boiler or vessel to atmosphere.
  2. Remove probe (if installed) and fit a pair of checking wires to the end of the probe tip, 90° relative to each other and a maximum 10 mm from the tip end.
  3. Carefully pass probe through screwed connection and into the protection tube. The checking wires will deflect to allow them to pass through, and then spring back.
  4. Screw down probe by hand.
  5. Attach the earth lead of the meter to the boiler and the live lead to pin 1 of the probe connector. Check the contact to boiler with the meter.
  6. Activate meter and observe display. Slowly unscrew probe one full turn (without unduly rocking the probe).
  7. If no short circuit is found, disconnect the meter leads, unscrew and withdraw the probe.
  8. Remove checking wires and install probe.
  9. Low alarms must be functionally tested by lowering the water level before the boiler is allowed to run unsupervised.

DANGER

It is essential to remove the checking wires from the probe before commissioning the boiler or vessel. Failure to do this could lead to the low alarms not working.

If a short circuit was found during the test, further investigation is needed. Possible reasons include:

  • Probe tip bent or not attached properly.
  • Protection tube and/or screwed connection out of alignment.
  • Protection tube not of large enough bore and/or not deep enough (the tube should be at least 40 mm deeper internally than the end of the probe).

Spirax Sarco LP30 hazardous bent probe tipSpirax Sarco LP30 fitting checking wires side viewSpirax Sarco LP30 fitting checking wires top view