TLV SJH6NB Free Float Steam Trap with Thermostatic Air Vent

TLV SJH6NB inline repairable free float steam trap with thermostatic air vent (X-element). Designed for continuous condensate discharge in heat exchangers, tank heaters, and process equipment up to 32 barg.

TLV SJH6NB Free Float Steam Trap with Thermostatic Air Vent

TLV SJH6NB inline repairable free float steam trap with thermostatic air vent (X-element) is suitable for a wide range of applications with small-to-large capacities and pressures up to 32 barg, such as heat exchangers, tank heaters, dryers, and process equipment. The trap discharges condensate continuously and automatically, at a temperature slightly lower than saturation temperature.

Safety Considerations

WARNING

NEVER apply direct heat to the float. The float may explode due to increased internal pressure, causing accidents leading to serious injury or damage to property and equipment.

  • Installation, inspection, maintenance, repairs, disassembly, adjustment and valve opening/closing should be carried out only by trained maintenance personnel.
  • Install properly and DO NOT use this product outside the recommended operating pressure, temperature and other specification ranges. Improper use may result in such hazards as damage to the product or malfunctions.
  • DO NOT use this product in excess of the maximum operating pressure differential. Such use could make discharge impossible (blocked).
  • Do not subject this product to condensate loads that exceed its discharge capacity.

Configuration

TLV SJH6NB horizontal and vertical installation orientation

TLV SJH6NB structural configuration and components

No.Name
1Body
2Cover
3Float
4Orifice
5Orifice Gasket
6Orifice Plug Gasket
7Orifice Plug
8Cover Gasket
9Cover Bolt
10Cover Nut
11Screen Holder Gasket
12Screen Holder
13Main Screen
14Element Cover Gasket
15Element Cover
16Element Guide
17Air Vent Valve Seat
18Bimetal Plate
19Snap Ring
20Air Vent Valve
21Spring Clip
22Air Vent Screen
23Nameplate

Proper Installation

  1. Before installation, be sure to remove all protective seals.
  2. Before installing the trap, blow out the inlet piping to remove all dirt and oil.
  3. Install the trap in the lowest part of the pipeline or equipment so the condensate flows naturally downward into the trap by gravity. The inlet pipe should be as short and have as few bends as possible.
  4. Install the trap within the allowable inclination, as shown below. Also make sure that the arrow mark on the body corresponds with the direction of flow.
  5. When completing the piping, support the pipes properly within 800 mm (2.5 ft) on either side of the trap.
  6. Install a bypass valve to discharge condensate, and inlet and outlet valves to isolate the trap in the event of trap failure or when performing maintenance.
  7. Install a check valve at the trap outlet whenever the condensate discharge pipe leads to a tank or recovery line, or whenever the condensate collection pipeline is connected with more than one trap.

Maximum Allowable Inclination

TLV SJH6NB maximum allowable installation inclination

Piping Arrangement

Check to make sure that the pipes connected to the trap have been installed properly.

RequirementCorrectIncorrect
Install a catchpot of the proper diameter.Ensure proper sizingDiameter is too small.
Make sure the flow of condensate is not obstructed.Flush with pipe bottomDiameter is too small and inlet protrudes into pipe.
To prevent rust and scale from flowing into the trap, connect the inlet pipe 25 - 50 mm (1 - 2 in) above the base of the T - pipe.Elevated connectionRust and scale flow into the trap with the condensate.
When installing on the blind end, make sure nothing obstructs the flow of condensate.Unobstructed flowCondensate collects in the pipe.

Operational Check

A visual inspection can be carried out to aid in determining the necessity for immediate maintenance or repair, if the trap is open to atmosphere. If the trap does not discharge to atmosphere, use diagnostic equipment.

ConditionDescription
NormalCondensate is discharged continuously with flash steam and the sound of flow can be heard. If there is very little condensate, there is almost no sound of flow.
BlockedNo condensate is discharged. The trap is quiet and makes no noise, and the surface temperature of the trap is low.
BlowingLive steam continually flows from the outlet and there is a continuous metallic sound.
Steam LeakageLive steam is discharged through the trap outlet together with the condensate and there is a high-pitched sound.

Inspection and Maintenance

Operational inspections should be performed at least twice per year, or as called for by trap operating conditions. Steam trap failure may result in temperature drop in the equipment, poor product quality or losses due to steam leakage.

TLV SJH6NB inspection and maintenance warning

Parts Inspection Procedure

PartProcedure
Body, Cover(s)Check inside for damage, dirt, grease, oil film, rust or scale
GasketsCheck for warping or damage
X-element / Screen(s)Check for damage, clogging, or corrosion
FloatCheck for deformation, damage, oil film or water inside
Air Vent Valve Seat, OrificeCheck for rust, scale, oil film, wear or damage

Troubleshooting

If the expected performance is unachievable after installation of the steam trap, check the following points for appropriate corrective measures.

ProblemCauseRemedy
No condensate is discharged (blocked) or discharge is poorFloat is damaged or filled with condensateReplace the float
Orifice, screen or piping is clogged with rust or scaleClean
X-element is damagedReplace the X-element
The trap operating pressure exceeds the maximum specified pressureCompare specifications and actual operating conditions
Steam-locking has occurredBlow down through the bypass or allow the trap to cool
Steam is discharged or leaks from the trap outlet (blowing)Orifice is clogged, or rust and scale have accumulated under the floatClean
Orifice is damagedReplace the orifice
Float is deformed or coated with scaleClean or replace the float
Trap is installed above the maximum allowable inclination angleCorrect the installation
Vibration of trap occursLengthen inlet piping, then fasten it securely

Instructions for Plug / Holder Disassembly and Reassembly

The seal on the threaded plugs/holders found on TLV products is formed by a flat metal gasket. The gasket may be pinched in the thread recesses during assembly if not handled correctly.

TLV SJH6NB plug and holder disassembly instructions

  1. Remove the plug/holder using a tool of the specified size.
  2. The gasket should not be reused. Be sure to replace it with a new gasket.
  3. Clean the gasket surfaces of the plug/holder and the product body using a rag and/or cleaning agents.
  4. Coat both the gasket surface of the plug/holder and the threads of the plug/holder with anti-seize.
  5. Hold the plug/holder upside down to make sure that the anti-seize makes the gasket stick to the plug/holder.
  6. Screw the plug/holder by hand into the product body while making sure that the gasket remains tightly affixed to the center of the gasket surface.
  7. Tighten the plug/holder to the proper torque.
  8. Begin the supply of steam and check to make sure there is no leakage from the part just tightened.